East Campus Utility Work/ Traffic Impacts

Berry Street Student Housing Early Work

 

Dates:  12/02/2024-02-01-2025

Traffic Impacts
– No impact to traffic routes. Flaggers will direct
traffic when there are partial lane closures in
place.
– Proper signage will be posted.
– Temporary lot closures for lots EC-3 and EC-15

Pedestrian Impacts
– North Sidewalk of W Berry St will be closed.
– West Sidewalk of Greene Ave will be closed.
– Partial Sidewalk closure of East Sidewalk of
Cockrell Ave.
– Pedestrian route shown with green arrows.
– Proper signage will be posted.

 

 

East Campus Utility and Demolition Work

 

Dates: 12/02/2024-04/01/2025

Traffic Impacts
– Work will be phased. Map shows an overview of all work.
– No impact to traffic routes. Flaggers will direct
traffic when there are partial lane closures in
place.
– Partial lane closures will be re-opened each evening.
– Proper signage will be posted.

Pedestrian Impacts
– Work will be phased. Map shows an overview of all work.
– South Sidewalk of W Lowden St will be closed.
– South Sidewalk of W Cantey Ave will be closed.
– Partial Sidewalk closure of East Sidewalk of
Merida Ave.
– Pedestrian route shown with green arrows.
– Proper signage will be posted.